XRF paint testing
Checks tested painted surfaces for lead. For renovation planning or documenting paint conditions.
RYE, WESTCHESTER COUNTY
XRF paint testing and dust-wipe sampling for your apartment, building or next renovation.
Tell us the address. We’ll help you choose the test.
WHAT WE TEST
Checks tested painted surfaces for lead. For renovation planning or documenting paint conditions.
Measures lead in settled dust. Samples go to a laboratory, so report timing depends on analysis.
Separate project approvals from the painted surfaces that will change. List windows, doors, trim, walls, and access limits so the testing scope follows the work sequence and report user.
BEFORE YOU BOOK
Share the property address, rooms or components, planned work, access limits, and report user. This helps match the testing scope to the decision.
For a Rye renovation request, turn the work plan into a component list before testing. Note windows, doors, trim, walls, ceilings, built-ins, and other painted items that will be disturbed or retained. Identify rooms, access limits, and the report user. This gives the testing scope a direct connection to the sequence of work and makes exclusions visible before the field visit.
List every component that will be disturbed or retained, compare it with access limits, and request that tested components and exclusions be named.
Ask the renovation team to compare drawings, contractor notes, and site access with the requested areas. If a surface is hidden, occupied, locked, or covered, say so rather than assuming it can be tested. XRF findings apply to the tested paint locations. They do not establish dust conditions, repair completion, or the safety of untested components.
Eligible XRF reports may be available the same day when scope, access, scheduling, qualified personnel, and field conditions allow. Dust-wipe timing depends on laboratory analysis.
Send any deadline with the request, including when a contractor needs the information. Same-day XRF reporting can be considered only after scope and access are reviewed and field conditions permit it. Dust-wipe samples require laboratory analysis and follow a different timing path. Keep the report with the project file and verify that its component names match the work actually planned.