XRF paint testing
Checks tested painted surfaces for lead. For renovation planning or documenting paint conditions.
PLEASANTVILLE, WESTCHESTER COUNTY
XRF paint testing and dust-wipe sampling for your apartment, building or next renovation.
Tell us the address. We’ll help you choose the test.
WHAT WE TEST
Checks tested painted surfaces for lead. For renovation planning or documenting paint conditions.
Measures lead in settled dust. Samples go to a laboratory, so report timing depends on analysis.
For a repair, identify the painted components that will be disturbed and the report recipient. XRF addresses selected paint surfaces; dust wipes answer a separate question and need laboratory analysis.
BEFORE YOU BOOK
Share the property address, rooms or components, planned work, access limits, and report user. This helps match the testing scope to the decision.
For a Pleasantville apartment or older home, identify the rooms, painted surfaces, and planned work that led to the request. A useful scope can include walls, trim, doors, windows, or other components that may be disturbed. Add access limits, occupied areas, and the person who will use the report so the field visit answers a defined question.
Name the painted components that will be disturbed and the report recipient. XRF and dust wipes answer different questions and have different report timing.
If the request relates to a repair, describe the work in practical terms: what will be removed, cut, sanded, scraped, or left in place. XRF results describe tested paint surfaces; they do not describe settled dust or replace project controls. If dust sampling is needed, list the rooms and surfaces separately and allow for laboratory analysis before relying on the result.
Eligible XRF reports may be available the same day when scope, access, scheduling, qualified personnel, and field conditions allow. Dust-wipe timing depends on laboratory analysis.
For scheduling, send the address, preferred dates, room list, and any building-access instructions together. Same-day XRF availability is conditional, so a short deadline should be discussed before the visit rather than assumed. Keep the final report with the project records and check that the named components, exclusions, and report recipient match the decision it must support.