Skip to content

HELL'S KITCHEN, MANHATTAN

Lead testing
in Hell's Kitchen.

XRF paint testing and dust-wipe sampling for your apartment, building or next renovation.

Tell us the address. We’ll help you choose the test.

Architectural streetscape in Hell's Kitchen, Manhattan.

WHAT WE TEST

Paint or dust?

01

XRF paint testing

Checks tested painted surfaces for lead. For renovation planning or documenting paint conditions.

02

Dust-wipe sampling

Measures lead in settled dust. Samples go to a laboratory, so report timing depends on analysis.

For a contractor follow-up, start with the address, rooms, painted components, access limits, and planned work. The neighborhood can orient the request, but property details decide what should be tested and reported.

BEFORE YOU BOOK

A few questions,
answered.

What should a contractor include in the request?

Send the address, rooms or components, access limits, planned work, and the decision deadline. If you need dust wipes, explain the dust question so the scope and timing are clear.

A contractor requesting testing in Hell's Kitchen should include the address, work areas, painted components that may be disturbed, access limits, planned tasks, and the date the result is needed for planning. Add the entry contact and identify shared or occupied spaces. A room-by-room request gives the testing scope something concrete to follow before a crew starts work.

Should I request XRF or dust wipes?

XRF fits a question about painted components. Dust wipes fit a settled-dust or post-work question and require laboratory analysis. One project may need one method or both.

Use XRF for the contractor's painted-component question. Use dust wipes for settled dust or a post-work question, with laboratory analysis required. If both questions affect the job, separate them in the request and identify where each method applies. That keeps a paint finding from being treated as a dust finding and helps the contractor plan around the correct report type.

What will the report cover?

A report covers the areas and components included in the agreed scope. It does not cover inaccessible areas or decide repairs, transactions, or other requirements outside that scope.

The report should identify the tested work areas and components, method, and any area that could not be accessed within the agreed scope. Keep it with the contractor's work records and compare it only to the scope it describes. It does not prescribe the contractor's repair method, certify every work area, or cover surfaces omitted from the request.

Get a quote.

Send the property address and what you need tested.